Safety and Compliance Built Into the Way We Work.

Our safety management system is built to meet the standards of civil construction and government project delivery. Not ticked off at site entry — integrated into how we plan, mobilise and execute every scope.

Big Timber operates a fully in-house HSE framework. Every SWMS is site-specific. Every crew member is inducted. Every incident is reported. We don’t outsource our safety obligations to a third-party advisor — we own them.

Our approach

A civil construction approach to on-site safety.

Big Timber Tree Services was built with a Tier 1 safety framework from the very beginning. Our in-house HSE Advisor, Niamh O’Connor, brings a civil construction background to every project and manages our safety systems the way a principal contractor’s safety team would.

We use Fleet Office for machinery tracking, pre-start records and compliance documentation. Our environmental management plans cover sediment controls, waterway protection, weed and pest management and fauna spotting requirements, developed specifically for each site.

We implement comprehensive SWMS, site-specific inductions, daily Take-5s, toolbox talks and pre-starts on every project, whether we are the principal contractor or a subcontractor working within another company’s safety management system.

This is a genuine commitment to the standard that keeps your people, your site and your project safe.

Standard vs Big Timber

The difference procurement actually feels.

On-Site
HSE Advisor
SWMS / EMP
Pre-start records
Environmental controls
Principal contractor ready
Standards benchmark
Typical Company
Outsourced / ad-hoc
Generic templates
Paper / inconsistent
Bolt-on for audit
Case-by-case
Residential norms
Big Timber
In-house, on every project
Site-specific, integrated with yours
Fleet Office digital tracking
Planned in from mobilisation
Local Buy · VendorPanel · QAA
Tier 1 civil construction

Dedicated In-House HSE Advisor on Every Project

Niamh manages safety documentation, inductions and on-site compliance personally, with direct accountability on every project we take on.

Systems That Integrate With Yours

Our documentation and pre-start records are structured to align with principal contractor requirements so your QA team isn’t chasing paperwork.

Environmental Management as a Core Deliverable

Site-specific EMPs, sediment controls and fauna management are planned and implemented as part of every scope from the start.

Accredited, Registered and Pre-Qualified

QAA Approved Contractor, Local Buy pre-qualified and VendorPanel registered. The supplier qualification paperwork is already done.

ACCREDITATIONS & REGISTRATIONS

The paperwork is already done.

Every document listed below is maintained, current, and available for pre-qualification review. We don’t build the file when you ask for it — it already exists.

Ready to Add us to Your Prequalified Panel?

Send us a request and we’ll have the documentation to you within one business day.

Download Our
Capability Statement